Mini-CHP (Combined Heat and Power)
SP Trade, the official representative of Liyu Power in Russia, offers the opportunity to purchase gas engine units (GEUs) designed for the establishment of energy centers (CHP and TPP). This equipment is ideally suited for use in various industries that require reliable, efficient, and eco-friendly generation of electricity and heat.
Why You Should Order a Mini-CHP from Us
1. Official Distributor of Liyu Gas Power
SP Trade is the official distributor of Liyu Gas Power, a globally recognized company in the production of gas engine units. This ensures our clients receive expert support, direct supplies, factory warranty, and post-warranty service.
2. Adaptation of GPU for the Russian market.
Gas piston units "Liyu Gas Power" manufactured in China require certain modifications to comply with Russian legislation and end customer preferences.
· Localization of control panels.
· User and maintenance manuals in Russian language.
· Technical documentation for design and installation of units in Russian language.
· Remote monitoring of units.
· Supplementation with exhaust gas boilers for optimal overall efficiency.
· Synchronization of units with an external network with flow control, cascade control of GCU, transition to island mode, and reverse resynchronization.
· Integration with additional equipment into a single energy center (absorption machines, boiler equipment, thermal unit, distribution device, dispatch, remote monitoring)
3. Comprehensive range of services from a single provider
· Selection and design of mini-CHP to meet your needs
· Delivery and installation of equipment
· Warranty and post-warranty service
· Spare parts warehouse in Moscow.
· Technical support 24/7
· OIL SERVICE – supply of lubricants and further support for sampling, oil change recommendations
· Training of operators and service specialists for TO W30 (2000 hours)
4. Experience and Expertise
Our specialists have many years of experience in small-scale energy projects and will help you find the optimal solution for your business. They will prepare a preliminary feasibility study for the project, including determining the equipment payback period and the project’s IRR.
Need a reliable mini power plant? Submit a request, and our specialists will find the best solution for you!










