Gas Engine Power Plant Liyu Power LY2000

2,000 kW

For installation in the machine room

'SP Trade', the official distributor of Liyu Gas Power in Russia, offers to purchase 2 MW gas-powered generator sets (GES) for businesses requiring reliable and cost-effective energy supply. The units meet the needs of various facilities, providing a stable supply of electric power and heat.

Types of Fuel for 2000 kW GES

Our 2000 kW gas-powered generator sets operate on natural and other suitable combustible gases (APG, landfill, biogas, etc.). The use of such fuel types reduces operating costs of the station and minimizes environmental impact compared to diesel. Moreover, the 2 MW mini-CHPs can operate efficiently even under challenging climatic conditions, providing an electrical efficiency of 41.6% and stable output voltage.



Number of cylinders

Number of cylinders

20

20

Electric Power

Electric Power

2,000 kW

2,000 kW

Thermal power

Thermal power

2,160 kW

2,160 kW

Electrical efficiency:

Electrical efficiency:

41.6%

41.6%

Overall Efficiency:

Overall Efficiency:

86.4%

86.4%

Type of gas:

Type of gas:

natural

natural

Dimensions (L x W x H):

Dimensions (L x W x H):

7320/1700/2615 mm

7320/1700/2615 mm

Net weight:

Net weight:

17,000 kg

17,000 kg

Operating Modes

The gas piston unit can be both a primary and a backup source of electricity. Depending on the operating conditions, the GPU 2000 kW can operate in two modes relative to the external power system:



  1. Island (autonomous) — power supply is completely provided by the gas piston power plant since the required capacity of the external network is absent or there are no technical conditions for its connection.

  2. Parallel — the power station operates simultaneously with the external network, supplying consumer loads both from the generator and from the grid, without transmitting electricity to the grid. This is the most reliable and widespread working principle. For parallel operation, the generator is synchronized with the network in terms of frequency and voltage.

Advantages of a 2 MW Gas Engine Power Plant

Advantages of a 2 MW Gas Engine Power Plant

Advantages of a 2 MW Gas Engine Power Plant

The main advantage of the 2000 kW gas power unit is its cost-effectiveness. Despite the high cost of a 2 MW gas engine power plant, operating a gas engine power station (GEPS) is significantly cheaper than traditional diesel stations. Other advantages include:



  • Power. 2000 kW is sufficient to supply energy to large enterprises requiring stable power supply.

  • Reliability. The use of a modern gas engine and a highly efficient generator allows the station to operate without interruptions.

  • Application flexibility. The installation can work autonomously or as part of large power systems, making it suitable for both industry and public utilities.



LLC "SP Trade" offers competitive prices for purchasing gas engine power plants. The opportunity to buy a 2000 kW GEPS with technical support and related services allows clients to find the most cost-effective solution for their needs.

Inquire about the cost of a 2 MW gas engine power plant or ask any questions about the equipment via the phones: +7 985 460 19 97, +7 985 460 11 60.

The main advantage of the 2000 kW gas power unit is its cost-effectiveness. Despite the high cost of a 2 MW gas engine power plant, operating a gas engine power station (GEPS) is significantly cheaper than traditional diesel stations. Other advantages include:



  • Power. 2000 kW is sufficient to supply energy to large enterprises requiring stable power supply.

  • Reliability. The use of a modern gas engine and a highly efficient generator allows the station to operate without interruptions.

  • Application flexibility. The installation can work autonomously or as part of large power systems, making it suitable for both industry and public utilities.



LLC "SP Trade" offers competitive prices for purchasing gas engine power plants. The opportunity to buy a 2000 kW GEPS with technical support and related services allows clients to find the most cost-effective solution for their needs.

Inquire about the cost of a 2 MW gas engine power plant or ask any questions about the equipment via the phones: +7 985 460 19 97, +7 985 460 11 60.

The main advantage of the 2000 kW gas power unit is its cost-effectiveness. Despite the high cost of a 2 MW gas engine power plant, operating a gas engine power station (GEPS) is significantly cheaper than traditional diesel stations. Other advantages include:



  • Power. 2000 kW is sufficient to supply energy to large enterprises requiring stable power supply.

  • Reliability. The use of a modern gas engine and a highly efficient generator allows the station to operate without interruptions.

  • Application flexibility. The installation can work autonomously or as part of large power systems, making it suitable for both industry and public utilities.



LLC "SP Trade" offers competitive prices for purchasing gas engine power plants. The opportunity to buy a 2000 kW GEPS with technical support and related services allows clients to find the most cost-effective solution for their needs.

Inquire about the cost of a 2 MW gas engine power plant or ask any questions about the equipment via the phones: +7 985 460 19 97, +7 985 460 11 60.

Liyu Power LY2000

Liyu Power LY2000

Liyu Power LY2000

Liyu Power GPU Model

LY2000 (LY2000GL-T, LY2000GM-T, LY2000GH-T)

Liyu Power GPU Model

LY2000 (LY2000GL-T, LY2000GM-T, LY2000GH-T)

Liyu Power GPU Model

LY2000 (LY2000GL-T, LY2000GM-T, LY2000GH-T)

Engine model

LY20V170-T

Engine model

LY20V170-T

Engine model

LY20V170-T

Electric Power

2,000 kW

Electric Power

2,000 kW

Electric Power

2,000 kW

Thermal power

2,160 kW

Thermal power

2,160 kW

Thermal power

2,160 kW

Electrical Efficiency

41.6%

Electrical Efficiency

41.6%

Electrical Efficiency

41.6%

Overall efficiency

86.4%

Overall efficiency

86.4%

Overall efficiency

86.4%

Voltage

0.4/6.3/10.5 kV

Voltage

0.4/6.3/10.5 kV

Voltage

0.4/6.3/10.5 kV

Fuel consumption at 100%, LHV – 9.3

517 Nm3/h

Fuel consumption at 100%, LHV – 9.3

517 Nm3/h

Fuel consumption at 100%, LHV – 9.3

517 Nm3/h

Type of Fuel

Natural gas (GOST 5542-2014), APG, BIO, landfill gas, etc.

Type of Fuel

Natural gas (GOST 5542-2014), APG, BIO, landfill gas, etc.

Type of Fuel

Natural gas (GOST 5542-2014), APG, BIO, landfill gas, etc.

Specific oil consumption

≤0.2 g/kWh

Specific oil consumption

≤0.2 g/kWh

Specific oil consumption

≤0.2 g/kWh

Service Interval

2,000 m/h

Service Interval

2,000 m/h

Service Interval

2,000 m/h

Service life until major overhaul

64,000 hours

Service life until major overhaul

64,000 hours

Service life until major overhaul

64,000 hours

Dimensions (L x W x H)

7320/1700/2615 mm

Dimensions (L x W x H)

7320/1700/2615 mm

Dimensions (L x W x H)

7320/1700/2615 mm

Net weight

17,000 kg

Net weight

17,000 kg

Net weight

17,000 kg

Additional Technical Specifications

Additional Technical Specifications

Additional Technical Specifications

4-valve individual head for each cylinder.

4-valve individual head for each cylinder.

4-valve individual head for each cylinder.

NOx Emissions: ≤500 mg/Nm³ (2 g/kWh)

NOx Emissions: ≤500 mg/Nm³ (2 g/kWh)

NOx Emissions: ≤500 mg/Nm³ (2 g/kWh)

Two-stage cooling of the gas-air mixture.

Two-stage cooling of the gas-air mixture.

Two-stage cooling of the gas-air mixture.

Easy-to-maintain container design.

Easy-to-maintain container design.

Easy-to-maintain container design.

The positioning of the spark plugs is in the center of the cylinder heads within a cooled sleeve.

The positioning of the spark plugs is in the center of the cylinder heads within a cooled sleeve.

The positioning of the spark plugs is in the center of the cylinder heads within a cooled sleeve.

The content of harmful substances in exhaust gases is regulated by adjusting the temperature in the combustion chamber.

The content of harmful substances in exhaust gases is regulated by adjusting the temperature in the combustion chamber.

The content of harmful substances in exhaust gases is regulated by adjusting the temperature in the combustion chamber.

Question and Answer

How often is it necessary to perform maintenance on a 2000 kW gas power plant?

How often is it necessary to perform maintenance on a 2000 kW gas power plant?

How often is it necessary to perform maintenance on a 2000 kW gas power plant?

Under what climatic conditions is it permissible to operate a 2000 kW gas power plant?

Under what climatic conditions is it permissible to operate a 2000 kW gas power plant?

Under what climatic conditions is it permissible to operate a 2000 kW gas power plant?

Product Brochure

Take advantage of Liyu gas piston units and achieve: reduced costs for electricity and thermal energy, ensuring the energy independence of the enterprise.

Product Brochure

Take advantage of Liyu gas piston units and achieve: reduced costs for electricity and thermal energy, ensuring the energy independence of the enterprise.

Product Brochure

Take advantage of Liyu gas piston units and achieve: reduced costs for electricity and thermal energy, ensuring the energy independence of the enterprise.

Advantages

Advantages of Gas-Piston Power Plants

80x

Carbon footprint

We actively embrace new ideas and technologies, positioning ourselves at the forefront of industry advancements

0.2 g/kWh

LOW OIL CONSUMPTION

The consumption of lubricating oil does not exceed 0.2 grams per kilowatt-hour.

2 MW = 17 t

Compactness

The best power-to-weight ratio.

2,000 engine hours

Service Interval

Maintenance with minimal equipment downtime.

41.6%

High performance

The efficiency of electricity generation reaches 41.6%, and in comprehensive operation with heat recovery taken into account, it can reach up to 90%.

> MN55

Operating on all types of gas

Electric generator sets operating on natural gas, biogas, associated petroleum gas, and other types of gaseous fuels.

less than 50 kopecks

Operating expenses

OPEX includes expenses for spare parts, labor, and technical fluids.

Advantages

Advantages of Gas-Piston Power Plants

0.2 g/kWh

LOW OIL CONSUMPTION

The consumption of lubricating oil does not exceed 0.2 grams per kilowatt-hour.

2 MW = 17 t

Compactness

The best power-to-weight ratio.

2,000 engine hours

Service Interval

Maintenance with minimal equipment downtime.

41.6%

High performance

The efficiency of electricity generation reaches 41.6%, and in comprehensive operation with heat recovery taken into account, it can reach up to 90%.

> MN55

Operating on all types of gas

Electric generator sets operating on natural gas, biogas, associated petroleum gas, and other types of gaseous fuels.

less than 50 kopecks

Operating expenses

OPEX includes expenses for spare parts, labor, and technical fluids.

Advantages

Advantages of Gas-Piston Power Plants

80x

Carbon footprint

We actively embrace new ideas and technologies, positioning ourselves at the forefront of industry advancements

0.2 g/kWh

LOW OIL CONSUMPTION

The consumption of lubricating oil does not exceed 0.2 grams per kilowatt-hour.

2 MW = 17 t

Compactness

The best power-to-weight ratio.

2,000 engine hours

Service Interval

Maintenance with minimal equipment downtime.

41.6%

High performance

The efficiency of electricity generation reaches 41.6%, and in comprehensive operation with heat recovery taken into account, it can reach up to 90%.

> MN55

Operating on all types of gas

Electric generator sets operating on natural gas, biogas, associated petroleum gas, and other types of gaseous fuels.

less than 50 kopecks

Operating expenses

OPEX includes expenses for spare parts, labor, and technical fluids.

Capabilities of Chinese GPUs

Advantages of containerized installation of gas-based mini-CHP plants

Production time

Manufacturing a gas-piston unit in full factory configuration takes from 4 to 6 months.

Operational convenience

The overall dimensions of the containerized gas-turbine unit — 13.5 x 3.0 meters — allow for easy maintenance.

Noise filtering and suppression

All power plant containers are equipped with a supply and exhaust ventilation system with pre-filtration and noise reduction.

Mass

Chinese power plants have the best specific mass per unit of power.

Monitoring

Remote report on the power plant operations, as well as a list of malfunctions and events in the system.

Localized operator menu

Visualization of equipment operation parameters in Russian.

Capabilities of Chinese GPUs

Advantages of containerized installation of gas-based mini-CHP plants

Production time

Manufacturing a gas-piston unit in full factory configuration takes from 4 to 6 months.

Operational convenience

The overall dimensions of the containerized gas-turbine unit — 13.5 x 3.0 meters — allow for easy maintenance.

Noise filtering and suppression

All power plant containers are equipped with a supply and exhaust ventilation system with pre-filtration and noise reduction.

Mass

Chinese power plants have the best specific mass per unit of power.

Monitoring

Remote report on the power plant operations, as well as a list of malfunctions and events in the system.

Localized operator menu

Visualization of equipment operation parameters in Russian.

Capabilities of Chinese GPUs

Advantages of containerized installation of gas-based mini-CHP plants

Production time

Manufacturing a gas-piston unit in full factory configuration takes from 4 to 6 months.

Operational convenience

The overall dimensions of the containerized gas-turbine unit — 13.5 x 3.0 meters — allow for easy maintenance.

Noise filtering and suppression

All power plant containers are equipped with a supply and exhaust ventilation system with pre-filtration and noise reduction.

Mass

Chinese power plants have the best specific mass per unit of power.

Monitoring

Remote report on the power plant operations, as well as a list of malfunctions and events in the system.

Localized operator menu

Visualization of equipment operation parameters in Russian.

Other Power Plants of Hunan Liyu

Industry Solutions

Questionnaire

Please fill out the form, and we will send you a commercial offer.

Questionnaire

Please fill out the form, and we will send you a commercial offer.

Questionnaire

Please fill out the form, and we will send you a commercial offer.

Questionnaire

Please complete the questionnaire to prepare and receive a commercial offer.

Company Name, Taxpayer Identification Number (TIN)

Contact Phone

Contact e-mail

Contact Person

Priority Mode of Operation

Execution Option

Required electrical power, kW

Business Hours

Heating, Gcal/hr

Hot water supply, Gcal/hour

Hot water supply, Gcal/hour

Generator Voltage

Type of Gas

Gas limits availability

Gas pressure at the site, kPa

The price per 1 kWh of electricity, including capacity surcharge

Price for 1,000 m3 of gas, including transportation

The cost per 1 MW (or 1 Gcal) of heat (the production cost of Gcal from an in-house boiler)

Questionnaire

Please complete the questionnaire to prepare and receive a commercial offer.

Questionnaire

Please complete the questionnaire to prepare and receive a commercial offer.

Company Name, Taxpayer Identification Number (TIN)

Contact Phone

Contact e-mail

Contact Person

Priority Mode of Operation

Execution Option

Required electrical power, kW

Business Hours

Heating, Gcal/hr

Hot water supply, Gcal/hour

Hot water supply, Gcal/hour

Generator Voltage

Type of Gas

Gas limits availability

Gas pressure at the site, kPa

The price per 1 kWh of electricity, including capacity surcharge

Price for 1,000 m3 of gas, including transportation

The cost per 1 MW (or 1 Gcal) of heat (the production cost of Gcal from an in-house boiler)

Create a free website with Framer, the website builder loved by startups, designers and agencies.